Norco Summer Work on Your Own Time Volunteer Work

Punch List of Work still to do after the May Spring cleanup

Inside Clubhouse

  • mop kitchen floor
  • clean air filters 1st floor AC x 2 units ; operate and verify they are cooling ; note that outside is covered with plastic and needs removed
  • work with kitchen manager to clean grease trap
  • (licensed plumber   – fix 2nd floor 3 bay sink drain pipes to proper length; look over water leaking out of 1st floor outside spigot)
  • 2nd floor, sweep/mop and put down wood floor protection
  • 1st floor, apply wall kickboard strips with adhesive
Outside Clubhouse
  • remove all sand and gravel from grass due to plowing on both parking levels, patio, etc
  • add small piece of flashing over 2nd floor door entrance to drain rain water into gutter
  • patch over damaged vinyl siding
  • paint exterior doors
Grounds around the Clubhouse, Garage, etc

  • cut back path, trees, shrubs on two cart paths from the parking lot to the pheasant field/trailer
  • setup patio umbrellas, stored in garage
  • paint picnic tables
  • repair lawn archery target #2 wood frame
  • stack cut/spilt firewood into bus stop and by large lawn fireplace

Rifle Pistol Ranges

  •  Sift brass from raked piles of shell casings on rifle and pistol range floors
  • inspect paper target hangers and replace damaged screens with screen and zip ties
  • cut back brush from side berms for both ranges
  • move steel targets into fish shed ; repair steel shooting tree wood support